TARGET STORES                Owner’s Rep
$1 million with renovations
Pulled all permits
Present
RESIDENTIAL HOME, Dover, MA Construction and Code Deficiencies Expert
$3 Million dollars
2020
BEREA CHURCH,
Boston, MA Clerk of Works
$1.5 Million Renovation
2020
RESIDENTIAL HOME, Newton, MA General Contractor
7,600 SF
$2.5 million
Punchlist, mold remediation
2019
FRIEND STREET, Boston, MA Clerk of Works
7 Story Concrete Modular Precast
$4 Million
2019
FEDERAL & STATE HISTORICAL CUSTOM HOUSE, Longwharf, Boston, MA Clerk of Works
$21 Million
Renovation 85,000 SF
Punchlist, Mold remediation
2019
Commercial $21 Million Renovation, Boston, MA
Punchlist, Mold Remediation
7600 SF Residence
$35,000
2019
RESIDENCE (7600 SF) General Contractor
$30,000
2019
NINE CONDOMINIUM UNITS, East Boston, MA Development Specialist
Total value $5 million
Purchase, Zoning, Estimated Values Construction
2017-2018
WATERMARK, Lowell, MA Clerk of the Works, Worcester, MA School System
$10 million – 4 schools
Window replacements, Door units, Boilers
2017-2018
WATERMARK, Lowell, MA Clerk of the Works, Lt. Peter Hansen School, Canton, MA
$1.5 million – New roof 850 Sq, Drains, HVAC, Electrical
2017
CITY OF TAUNTON, MA Fire Incident Town Hall
Insurance Dispute – $1.5 million vs $8.5 million
2017-2018
FORENSIS GROUP, INC., Pasadena, CA Various Construction, Safety Cases
2016 - 2017
WOODS CONSTRUCTION, INC., Sterling Height, MI JC Penney Store Renovation - $300,000, Wareham, Massachusetts
Pull Permits, Oversight
2017
NEW RESIDENTIAL HOME 6000 SF Owner’s Representative, $1.1 Million
Middleton, Massachusetts
2016
WOODS CONSTRUCTION, INC., Sterling Height, MI Target Store Renovation Somerville, Stoughton, Watertown, Massachusetts
Pull Permits, Oversight
$1 Million Renovation
2015-2016
WILSON ELSER MOSKOWITZ EDELMAN & DICKER LLP Construction Deficiencies Expert
Beverly Hospital new construction, completed 2007
Flooring
Sub-Surface Drainage System
VCT Flooring Issues
Roof Issues
Site Issues: Concrete, asphalt storm drainage, HVAC
2015-2016
ENVELOPE CONSULTANT
Water Infiltration / Mold Issues Strip Mall, Lynnway, Lynn, MA
2013
ENVELOPE CONSULTANT
Water Infiltration
9 Unit High End Condominiums
South Boston, RJ Kenny Company Testing
2013
LINCOLN PROPERTY COMPANY Gran Marc Northeastern University Dormitories
$100 million 17 Story High Rise Structure, Demolition of 12 Story Structure
Clerk of Works – Boston Inspectional Services Requirement
Type IA Structure
Precast, Metal Panels
2012-2014
LINCOLN PROPERTY COMPANYÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â 320 Summer Street, South Boston, MA, Type IIIB Structure
$26 million Rehabilitation Mill Buildings and Tenant Build-Out
6 Story High Rise Structure
Clerk of Works – Boston Inspectional Services Requirement
Post & Beam, Masonry Exterior
2012-2013
BROADMEADOW CONDOMINUMS 131 Franklin Street, Stoneham, MA
Envelope Water Infiltration / Mold Issues Masonry IIIA Structure
H.B. COMPANIES, LONGWOOD, FLORIDAÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Subcontractor, Repairs
$160,000
FedX, Home Properties, Roofs, Masonry, Metal Buildings
2011-2012
TOWN OF DRACUT, CENTRAL FIRE STATION           Consultant, Expert Witness
$2 million project masonry structure
Construction, Code Deficiencies
Building, Mechanical and Site Issues
 2009-2010
HARRISON BROWN CONSTRUCTIONÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â 145 & 147 Wheeler Circle (Stone End), Stoneham, MA
Fire Restoration Oversight, Masonry Issues
R2 Apartments $1 million
2009-2010
36 CENTRAL ST, ANDOVER, MAÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Convert 8 Unit R2 Apartment Complex to Condominiums
Construction, Code Deficiencies
Value of Project $2 million
2009-2010
CARFARO, INC. Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Highland House Apartments, Randolph, MA
Oversight Railings Installation
R2-139 Units, $219,000
2008
#2 LANTERN LANE, NORTH READING, MAÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â General Contractor
R-3 Single family home – additions, renovations, windows, siding,
Roofing, kitchen, $150,000
2008
HARRISON BROWN CONSTRUCTIONÂ Highland Avenue, RANDOLPH, MA
Oversight rehabilitation of balconies and railings
R2 139 Units, $208,500
2008
HARRISON BROWN CONSTRUCTIONÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Liberty Place, RANDOLPH MA
Oversight rehabilitation of envelope roofing, siding, window
Replacement
R2 Apartments Multi-Units, $800,000
2008
COMMERCIAL CONSTRUCTION CONSULTING, INC. Jefferson at Admiral’s Hill, CHELSEA, MA
Façade – inspection of the envelope for water filtration – flashings, roofing, siding, windows, doors, foundations, masonry
R2 Apartments 5A Construction
160 Units $38 million
2008
THE GOLDEN BANANA NIGHT CLUBÂ General Contractor, Total Renovation 151 Rear Newbury Street, PEABODY, MA
One Story 10,000 SF Type 3B Structure
$1 million – 6 weeks
2007
108 ALMONT STREET, WINTHROPÂ Â General Contractor- Fire Restoration
R-3 Single family home – additions and renovations
$450,000, Cement board siding
2007
COMMERCIAL CONSTRUCTION CONSULTING, INC. Owner’s Representative, 267 Medford Street, CHARLESTOWN, MA
6-story mill building – Type 3 Construction, Use R2 & S1
124 loft type units total renovation
$22 million
Post & Beam, masonry exterior
2007
COMMERCIAL CONSTRUCTION CONSULTING, INC. 555 Pleasant Street, WATERTOWN, MA
Façade – Inspection of the envelope for water infiltration – flashings,
roofing, windows, doors
5A Construction, R2, 179/Condominium units $34 million
Cement board exterior
2007
FORTY FIVE GROVERS AVE, LLCÂ Grovers Avenue, WINTHROP, MA
Condominium Conversion on Water; Four Units, Total Rehab – Retail $2.2 million
150 year-old structure restoration
Owner’s Representative, Construction Manager
Cement board exterior
2005-2006
CENTER FOR COMMUNITY HEALTH EDUCATION & RESEARCH INC (CCHER)   Washington Street, DORCHESTER, MA – Eustache Jean-Louis MD
Type 5A Construction, Business Use, Clinic; 2-story addition & renovations - $550,000
Owner’s Representative
2004
THE MILES GROUP     WINTHROP REALTY TRUST, THE BEACH HOUSE Cliff Street, WINTHROP, MA – Demolition 22,000 SF
5A Structure – Build Six Luxury Townhouses, $4 million
General Supt., Development Specialist Partner
2003-2004
ACTON ASSISTED LIVING LLC ACTON, MA – $7.6 million 80 units 66,000 SF
Type 5A ConstructionÂ
Change Order review. $1.2 million.
2002
FOCACCIA ITALIAN RESTAURANTÂ Â
General Contractor Build Out
2 Lowell Street, WILMINGTON, MA
One Story 6000 SF Type 2C Structure
125 Seat Restaurant, Entertainment Lounge, Function Room -- $750,000 – 12 weeks
2000
THE MZO GROUP   STONEHAM, MA – Cumberland Crossing, Cumberland, RI Luxury Apartments—$ 19 million 250 units Construction Control
Assist in the resolution of problems and respond to correspondence from the CM & AIA.
Attend all meetings specific to the particular discipline.
Make weekly site visits to monitor quality of construction & do reports.
Type 5A Construction
2000
ESSEX ST ASSOCIATES/FARROW CONST. INC. JACOBS POND ESTATE NORWELL, MA – 45 Units Assisted Living—8.5 Million, 65,000SF+
Construction Manager
Responsible for Construction, Code, and Safety Issues
Assist the PM in its outreach to trade contractors and the development of pre-qualification criteria, and value engineering.
Assist in the resolution of problems and respond to correspondence from the PM & Superintendent.
Attend all meetings specific to the particular discipline.
Type 5A Construction
2000
DINISCO DESIGN PARTNERSHIP ARCHITECTS AND PLANNERS, BOSTON, MA Construction Code Inspector Projects Multi-million dollar-Codes, Construction Issues, Building Assessments (Cameron Middle School, Framingham, MA, Framingham High School - 350,000 SF, Brown School, Peabody, MA, Mullen School, Falmouth, MA, Center School, Winthrop, MA, FT Bank School, Winthrop, MA, McCarthy School, Peabody, MA, Carroll School, Peabody, MA)
Review design documents for completeness, constructability, and code issues.
1999-2000
T.R. WHITE CO., INC.  GENERAL CONTRACTORS, BOSTON, MA
Project Superintendent 7.5 Million Addition/Renovation – 160,000 SF (Center Elementary School, Masonry Structure, Chelmsford, MA)
Review design documents for completeness and constructability.
Assist in the review and analysis of trade contractor qualification statements.
Monitor the work of the subcontractors during construction.
Assist in the resolution of problems and respond to correspondence from the PM & AIA.
Assist Change Order Administrator with preparation of change orders and estimate values for change orders.
Oversee & supervise all phases of construction.
1998-1999
P.F. DEPESA & ASSOCIATES Consultant/Expert Witness on:
Build outs Focaccia Italian Restaurants, Bake Shop, Function Room
Diagnostic Inspection, Construction Defect Issues
Building & Fire and Mechanical Code Issues
Construction-Arbitration-Safety Issues; Accessibility and Zoning Issues
Haz Mat and Fire Issues
Forensic Estimating
Consulting with Law Firms, Architects, Contractors, and Owners
1996-PRESENT
TOWN OF ANDOVERÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â BUILDING INSPECTOR
Responsible for permit review procedures and construction plan reviews to assure compliance with state and local building codes and zoning regulations and bylaws and all applicable federal regulations, New construction, Renovation, Demolition.
Directly involved in plan reviews and meetings with architectural and engineering teams, owners, and facility managers.
Issued permits and conduct on-site inspections of work in progress to assure conformance with building codes and zoning regulations and quality control and job site safety.
Issued stop work orders when violations of building codes and zoning regulations are found.
Answered inquiries from architects, engineers, contractors, and the general public concerning building codes and zoning regulations.
Make site visits to monitor quality of construction.
Dollar value of commercial contracts in excess of 300 million dollars. 100 million dollars in custom-build homes; school building projects in excess of 40 million dollars.
1994-1998
A. DEPESA & ASSOCIATES NATIONALLY CERTIFIED BUILDING INSPECTOR – Reviewed Quality Control, Code Consulting and Cost Estimating
Projects included:
60 Canal Street, Boston, MA; Northeast Foundations Cost Estimates on Lawrence, CT, Dor. CT, Lowell Square, Boston; The Salvation Army, Boston--Lynn, 72 Unit Birchwood Condominiums in Weymouth, MA; Focaccia Italian Restaurant, Reading, MA – Total renovation.
1995-1996
DEPESA BUILDERS, INC. PRINCIPAL -- GENERAL CONTRACTING
Estimated millions of dollars worth of construction. Monitor the work of the subcontractors during construction. Review bid documents prepared by the CM. Attend and contribute to value engineering workshops and reviews. Made daily site visits to monitor quality of construction. Engaged in site work, drainage, foundations, waterproofing, structural steel, brickwork, roofing, carpentry, plumbing, electrical, HVAC, fire alarms, and sprinkler systems.
1988-1995
SPACE SAVER SHELVING CO.
Owned and operated company specializing in the design and installation of custom closet systems. During this time, negotiated, bought, renovated and sold two million dollars in commercial and residential property; renovated and owned three retail stores. Specifically: Attended and contributed to value engineering workshops and reviews; Reviewed bid documents prepared by the CM; Monitored the work of the subcontractors during construction.
1983 TO 1988
CITY OF QUINCY FIRE DEPARTMENT Served as Firefighter and Emergency Medical Technician. Received extensive training in fire prevention techniques, life safety, fire resistant construction, fire suppression systems, and hazardous materials containment.
1972 TO 1985
CARPENTERS LOCAL UNION #33—MILLWRIGHTS #1121 FOREMAN/TRADESMAN WORKING ON VARIOUS PROJECTS, INCLUDING BUT NOT LIMITED TO:
Tenant fit-up, pile caps, pile driving, sheet piling, H-piles, concrete footings, and slabs, masonry, structural concrete, soldier beams, underpinning, ground modifications, I93 Bridges Boston, Cape Ann Bridge Gloucester, Deer Island Water Treatment Plant, Power Plants, Steam Turbines, Pumps, Machinery, Conveyor Systems, welding, structural steel/piping, structural steel welding, SIP forms, concrete barricades, and specialized pedestal foundations. Companies included: Vappi – James Farina; Aberthaw – A.J. Spinelli; Franchi – Stone & Webster; Perini – Volpe. Certified welder-burner, brazing, mild steel HY 80, and heliarc.
1964 TO PRESENT
LICENSES/CERTIFICATIONS
Boston ABC
Mass State Construction Supervisor
MA Home Improvement Contractor Registration
Certified Owens Corning Underground Tank Installer
ICC Commercial Inspector
ICC Building Inspector
ICC Certified Building Official
ICC Commercial Mechanical Inspector
ICC Mechanical Inspector
MASS State Certified Building Official (C.B.O.)
MEMA Certified Seismic Assessment
HAZMAT Supervisor
Lead Safety for Renovation, Repair, Painting (EPA RRP)
Occupational Safety and Health Administration, OSHA 10, OSHA 30 hour training
ASSOCIATIONS
Massachusetts Building Commissioners and Inspectors Association, (MBCIA)
International Code Council (ICC)
National Fire Protection Association
(NFPA)
EDUCATION AND VALUE ENGINEERING WORKSHOPS
WENTWORTH INSTITUTE – Building Technology – Estimating
MASSASOIT JR. COLLEGE – Fire Science Program – Sprinklers, Alarm Systems
CPR/FIRST AID – Safety on Job Sites -- OSHA
MEMA Post Earthquake Safety Evaluation of Building Training
UBC HEALTH AND SAFETY FUND – Certified 40 Hr Hazardous Waste Worker Training Program/Supervisor Training Program
US DEPARTMENT OF LABOR – 30 Hour Occupational Safety and Health Training Course (OSHA)
TUFTS UNIVERSITY – Procedures and Practices Asbestos Abatement
BAGB Seminar – A.D.A. – Certificate of Participation
NORTHEASTERN UNIVERSITY – Structural Design and Site Planning, Introduction to Design Wood Structures, Troubleshooting
Mechanical (HVAC), Indoor Air Quality (HVAC) and HVAC I
BOCA Seminars on Mechanical, and Non-Structural Plan Review
AMERICAN ARBITRATION ASSOCIATION – Effective Construction Conflict Management/Advocacy in Mediation
BOCA Seminar International Mechanical Code
Board Building Regulations & Standards (BBRS) Manufactured Housing Code Seminar
Middlesex Community College—Carol A. Rolf, Esq., The Zoning Act Chapter 40A
Sheet Metal Training School HVAC Duct Inspection Seminar
Thermafiber Fire Containment in Multiple Story Buildings
MEMA ATC Training Post Earthquake Structures
Board Building Regulations and Standards: Fire Resistance – Rated Construction and Firestop System Solutions
Mold Seminars, Building Science Corporation, Joseph Lstiburek Ph.D., P. Engineering
OSHA, New England Carpenters Training Center, Scaffold Safety
Massachusetts Division of Occupational Safety, Fall Protection Scaffolds, Steel Erections, Excavations
LEED Energy (Green Building) Classes -- Preparation for Exam, New England Carpenters Training Center
Massachusetts Residential Energy Code
Manufactured Building Program
Stairs and Stairways 7th and 8th Editions of Code/Means of Egress
Department Public Safety Manufactured Buildings Program
Chapter 9 Building Permit and Inspection Requirements for Fire Protection and Life Safety Systems
Certificate of Completion Green Building Training Requirements
Residential and Commercial Energy Code Training
2009 International Mechanical Code (IMC)
Energy-Efficient Lighting and Designing
Chapter 9, Fire Protection and Life Safety
Structural Framing Residential Homes, Rafter Span Ratio, Installing Solar Panels on Existing Roofs
Safety Training Excavations MUST (Managing Underground Safety)
8th Edition MA State Building Code Existing Buildings Chapter 34 with IEBC 2009 Amendments
Ashrae Commissioning Green Buildings
Smart Buildings High Performance Homes (CET)
Chapman Construction Condensing Boiler Technology (CAPCO Energy Supply)
MBCIA Chapter 40A Zoning Updates; Attorney Mark J. Lanza
Chapter 4 Special Uses, Residential Board and Care Facilities, Group Residences, Day Care, Adult Day Care
Board of Examiners of Sheet Metal Workers, Basic Sheet Metal Design, Fabrication and Installation, Fire Life Safety,
Ventilation Systems, Duct Testing and Balancing
Updates to the Architectural Access Board 521 CMR and Issues of Today
Mixed Use Buildings with Commercial on Lower Level and Residential Above
Geothermal Systems
Fire Escape Awareness Seminar – CISCO Meneses
Smart Building: High Performance HVAC
Deep Energy Measures Verification, Joseph Lstiburek, Ph.D., Engineering
MGL. Chapter 40A Zoning updates, Attorney Mark Lenzi
2012 IECC Energy Code Updates Mr. Donald J. Vigneau, AIA
Spray Foam Insulation & 8th Edition of Mass Code
High Performance HVAC & High Performance Homes
Commercial & Utility-Scale 3-Phase PV Inverter Training Solectria Renewable
Night Club Inspections, Fire Academy, Stowe, Mass David Vouge and Tom Riley, BBRS
Overview International Existing Building Code with Massachusetts Amendments
09 IRC Overview with Massachusetts Amendments Tom Riley BBRS
Manufactured Building Program BBRS Roxul Energy Design Center – Building Science Consulting Day (Joe Lstiburek, Ph.D.-P. Engineer)
Training Simpson strong-tie continuous load paths (structural) beyond the basics of wood framing, Jim Mailey